Site Logo
My Account | Wishlist | Basket
All Categories
Gaming

Playstation 3

See More
DelTex
Gaming - Playstation 3

  1. Home
  2. Gaming
  3. Playstation 3
DelTex® Gold 3M USB Power Charger Cable For Sony PS3 DualShock Controller USB to Mini USB Charge and Play Cord Extra Long Lead PlayStation 3

DelTex® Gold 3M USB Power Charger Cable For Sony PS3 DualShock Controller USB to Mini USB Charge and Play Cord Extra Long Lead PlayStation 3

Best Selling Playstation 3

£3.99

Product Reviews

Name: Review:

Related Products

3M USB CHARGE CABLE FOR NINTENDO WII U CONTROLLER

3M USB CHARGE CABLE FOR NINTENDO WII U CONTROLLER

£8.63

Mini USB Cable - USB 2.0 to Mini B - Sync & Charge - Compatible with Portable Hard Drive, Sat Nav, Dash Cam, Hero 2/3/4, PS3 Controller, MP3/4 Player, Camera and more - Length = 3M / 9.8ft

Mini USB Cable - USB 2.0 to Mini B - Sync & Charge - Compatible with Portable Hard Drive, Sat Nav, Dash Cam, Hero 2/3/4, PS3 Controller, MP3/4 Player, Camera and more - Length = 3M / 9.8ft

£5.29

ModusTech 512GB External SSD USB-A and USB-C Dual USB Fast External SSD USB 3.2 | 3-Year Warranty | Portable Solid State Drive for Mac, PS4, Xbox X/S, PC, iPhone 15/16 | Flip-Cap Design (Gold, 512GB)

ModusTech 512GB External SSD USB-A and USB-C Dual USB Fast External SSD USB 3.2 | 3-Year Warranty | Portable Solid State Drive for Mac, PS4, Xbox X/S, PC, iPhone 15/16 | Flip-Cap Design (Gold, 512GB)

£49.97

BIWIN PR2000 External SSD 1TB, Up to 2000 MB/s, IP67 Dust & Waterproof Portable SSD, Up to 3m Drop Protection, Supports 4K 60FPS ProRes Record, USB-C USB3.2 Gen2x2, Black

BIWIN PR2000 External SSD 1TB, Up to 2000 MB/s, IP67 Dust & Waterproof Portable SSD, Up to 3m Drop Protection, Supports 4K 60FPS ProRes Record, USB-C USB3.2 Gen2x2, Black

£147.99

ROXEL All-in-One Hi-Fi System – CD Player, DAB+/FM Radio, BT 5.4, 100W Speakers, USB Playback, Optical TV Input, 3m Detachable Cables, Headphone Jack – Compact Home Stereo Audio, RCD-850BT (Gunmetal)

ROXEL All-in-One Hi-Fi System – CD Player, DAB+/FM Radio, BT 5.4, 100W Speakers, USB Playback, Optical TV Input, 3m Detachable Cables, Headphone Jack – Compact Home Stereo Audio, RCD-850BT (Gunmetal)

£169.99

BIWIN PR2000 External SSD 1TB, Up to 2000 MB/s, IP67 Dust & Waterproof Portable SSD, Up to 3m Drop Protection, Supports 4K 60FPS ProRes Record, USB-C USB3.2 Gen2x2, Orange

BIWIN PR2000 External SSD 1TB, Up to 2000 MB/s, IP67 Dust & Waterproof Portable SSD, Up to 3m Drop Protection, Supports 4K 60FPS ProRes Record, USB-C USB3.2 Gen2x2, Orange

£145.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyt.co.uk 2026

Have you checked out
Today's Deals?
See Deals